土星5号的历史 NASA SP-4206 Stages to Saturn
拔刀斋2013/09/09科学技术学 IP:北京
XXXXXXXXXXXXXXXXXXXXXXX/SP-4206/XXXXXXXXXXXm

SP-4206 Stages to Saturn
土星5号的各级(各阶段?)

Contents
第一页 总目录  NASA 原网页中每个条目都是可点击的链接

To

Wernher von Braun
1912 - 1977
    
and the men and women
who built the Saturn

picture of a Saturn V rocket on the launch pad



FOREWORD.
PREFACE.
ACKNOWLEDGMENTS.

I. PROLOGUE.

    1. Concepts and Origins.

II. THE SATURN BUILDING; BLOCKS.

    2. Aerospace Alphabet: ABMA, ARPA, MSFC.
      
    3. Missions, Modes, and Manufacturing.

III. FIRE, SMOKE, AND THUNDER: THE ENGINES.

    4. Conventional Cryogenics: The H-1 and the F-1.
      
    5. Unconventional Cryogenics: RL-10 and J-2.

IV. BUILDING THE SATURN V.

    6. From the S-IV to the S-IVB.
      
    7. The Lower Stages: S-IC and S-ll.
      
    8. From Checkout to Launch: The Quintessential Computer.

V. COORDINATION: MEN AND MACHINES.

    9. Managing Saturn.

    10. The Logistics Tangle.

Vl. STEP BY STEP.
      
    11. Qualifying the Cluster Concept.
      
    12. The Giant Leap.

VII. EPILOGUE.
      
    13. Legacies

      
APPENDIX A - SCHEMATIC OF SATURN V.
APPENDIX B - SATURN V PRELAUNCH - LAUNCH SEQUENCE.
APPENDIX C - SATURN FLIGHT HISTORY.
APPENDIX D - SATURN R&D FUNDING, HISTORY.
APPENDIX E - SATURN V CONTRACTORS.
APPENDIX F - LOCATION OF REMAINING, SATURN HARDWARE.
APPENDIX G - NASA ORGANIZATION DURING APOLLO-SATURN.
APPENDIX H - MSFC PERSONNEL DURING, APOLLO-SATURN.
      
NOTES.
SOURCES AND RESEARCH MATERIAL.
INDEX.
AUTHOR.
      

- Illustrations -



    Frontispiece - the Saturn V at LC-39.
    Seven photos of Apollo 11 mission.
    Photo of Robert Goddard.
    Photo of German rocket pioneers.
    Four photos of early rockets in the U.S.
    Wernher von Braun with the first seven astronauts.
    Launch of Alan Shepard on Mercury-Redstone.
    Scale comparison of U.S. manned space flight vehicles.
    Development of Saturn concepts.
    Saturn I with Mercury-Redstone and Juno II.
    President Eisenhower with first NASA Administrator T. Keith Glennan and Deputy Administrator Hugh Dryden.
    Wernher von Braun with his ABMA senior staff .
    President Eisenhower dedicates the George C. Marshall Space Flight Center.
    Abe Silverstein tours rocket facility.
    Two summary charts from the Silverstein Report.
    Early versions of the Saturn C-1 and C-5.
    The stable of NASA launch vehicles.
    John Houbolt and Lunar Orbit Rendezvous.
    President Kennedy at MSFC.
    Four aerial views of MSFC.
    Photos of Michoud Operations and Mississippi Test Facility.
    Saturn I design and manufacture.
    Saturn IB design and manufacture.
    Saturn engine applications.
    Turbopump for the H-1 engine.
    Specifics and systems of the H-1 engine.
    Firing and manufacture of the H-1 engine.
    Specifics and schematic of the F-1 engine.
    Engine start sequence for the S-IC stage.
    F-1 engine injector plate and turhopump.
    F-1 thrust chamber and brazing furnace.
    F-1 test stand.
    F-1 engine production line.
    Centaur stage with two RL-10 engines.
    RL-10 engine specifics and systems; engine cluster mounted in the S-IV stage of Saturn I.
    J-2 engine specifics, systems, assembly, and testing.
    Saturn S-IV stages.
    Seven photos of manufacturing the S-IVB stage.
    Comparison of S-IVB stages of Saturn IB and V.
    S-IVB stage rollout and testing.
    S-IC stage Saturn V launch vehicle.
    Five photos of skin fabrication for the S-IC stage.
    Six photos of assembly and testing of the S-IC stage.
    Seven photos of fabrication and assembly of the Sell stage.
    The mission control center at KSC.
    ST-124 inertial guidance platform.
    Instrument unit specifics, systems, and assembly.
    Wernher von Braun is briefed by Mathias Siebel.
    Saturn program major sites.
    Saturn contractors.
    Two organization charts of Saturn V program.
    Photo of Arthur Rudolph.
    NASA Office of Manned Space Flight Management Council.
    Manned Space Flight Awareness Program.
    Photo of MSFC's Saturn V program control center.
    S-IC flight stage at MSFC on its transporter.
    S-ll stage on its transporter.
    Five photos of the NASA barge fleet.
    Four photos of Saturn air transport.
    USNS Point Barrow.
    Saturn transportation equipment.
    Three views of Saturn I test flights.
    Two views of Pegasus payloads for Saturn I.
    Cutaway drawing and two views of the Saturn IB launch vehicle.
    AS-501, first flight-ready Saturn V.
    Launch Complex 39.
    Mobile Service Structures at LC 39.
    Apollo 8.
    Apollo 11 in flight; control room after launch; Astronaut Edwin Aldrin prepares to step onto lunar surface; lunar sample chest.
    Apollo 17 lunar roving vehicle.
    Commonality of Saturn hardware.
    Two photos of Saturn and Skylab.
    Two views of Saturn and the Apollo-Soyuz test Mission.
    Four photos of Huntsville, Alabama.
+1  科创币    发热门诊    2013/09/10 高质量发帖
来自:科创总论 / 科学技术学
5
已屏蔽 原因:{{ notice.reason }}已屏蔽
{{notice.noticeContent}}
~~空空如也
拔刀斋 作者
11年4个月前 IP:未同步
566562
Foreword
Foreword

[xi] Few of man's technological endeavors compare in scope of significance to the development of the Saturn family of launch vehicles.

At the time of this writing in 1979, we may still be too close to the project to see it objectively from the perspective of history, but I expect that future historians will compare the development of Saturn to such great and imaginative projects as the building of the Panama Canal and to such latter-day technological achievements as the Manhattan Project. In terms of both vision and achievement, Saturn may surpass them all.

It was as if the Wright Brothers had gone from building their original Wright Flyer in 1903 to developing a supersonic Concorde in 1913. Unimaginable; yet in 10 short years the builders of Saturn progressed from the small, single-engine rockets like Redstone to the giant vehicle with clustered engines that put man on the moon. Our Earth-to-orbit weight-lifting capability grew in that decade by 10 thousand times.

Saturn was an engineering masterpiece. The ultimate Saturn, taller than the Statue of Liberty, had a takeoff weight that exceeded that of 25 fully loaded jet airliners, and produced as much power as 85 Hoover Dams.

The Saturn program was also a masterpiece of management. There are those who hold that one of the principal benefits this country derived from the Apollo-Saturn lunar landing program was the development of a new and extraordinary management approach through which the National Aeronautics and Space Administration directed vast human and material resources toward a common purpose. The system that was developed to meet the incredible complexities of the program, taking account of its pioneering nature and the time constraint imposed, provides a pattern for managing a broad spectrum of future technological, scientific, and social endeavors.

One of the most remarkable things about the Saturn program was its success rate. An early press release openly stated that because of the [xii] complexity of the system and the tremendous advancement in technology required, program officials fully expected half of the 10 Saturn I's launched to fail. None did. Neither did any Saturn 1B, nor did any Saturn V, either test vehicle or operational rocket-and there were 32 Saturn launches in all.

The reliability assessment of the system was such that only two Saturn Vs were launched before the third sent Frank Borman's crew around the moon during Christmas of 1968. In all, 27 men went around the moon aboard Saturn-launched space vehicles, 12 actually walked on its surface.

Close on the heels of the lunar landing series, NASA developed Skylab, the world's first major laboratory in which we could operate experiments in the new environment of space. The Saturn again played a pivotal role in this enterprise-the core component of the Skylab itself being a modified Saturn stage. Only a Saturn V could lift the huge laboratory into orbit, which, when an Apollo spacecraft was annexed, weighed 100 metric tons and was 36 meters long. The three crews, which inhabited the space station for a total time of nearly six months, were launched on the smaller Saturn IBs. The Saturn family made Skylab possible, so Saturn deserves a large share of the credit for the mission's success in establishing a broad foundation of scientific and technological knowledge.

Furthermore, we should not overlook the role Saturn played in the Apollo-Soyuz Test Project of 1975. It was another Saturn IB that carried an American crew to its historic rendezvous with two Soviet cosmonauts in orbit. The reliable Saturn gave NASA every confidence that its crew could ascend on schedule following the Soviet launch half a world away and make the time-critical union of those two small objects in space. We had a high level of confidence that this, the last Saturn, would perform with the same excellence as its 31 predecessors. It did not disappoint us.

It should be pointed out that the Apollo-Saturn program was a national achievement. It has been estimated that 20 000 private firms and 300 000 people participated in the development of this system. The challenge taxed American ingenuity to the extreme. The result, of course, was that American technology made the "giant leap" referred to by Neil Armstrong. Whole new industries were born, offering products that touch our everday lives in ways we could not have dreamed of just a decade before.

We may not soon again face a challenge to match the lunar landing, and it may be some time before we mount the kind of scientific and engineering effort that gave us Saturn. Whenever that next challenge comes, we have in the Apollo-Saturn program the basic blueprint for achieving success. It not only will point the way but will also give the confidence needed to undertake new and dramatic challenges.

[xiii] Among the other lessons learned from the development of Saturn is the evidence of how much a free society can do and how far a dedicated people can go when they are properly challenged, led, motivated, and supported.

This is Our legacy from Saturn.



June 1979

William R. Lucas

Director, George C. Marshall
Space Flight Center
引用
评论
加载评论中,请稍候...
200字以内,仅用于支线交流,主线讨论请采用回复功能。
折叠评论
拔刀斋作者
11年4个月前 IP:未同步
566563
Preface
Preface

[xv] The gigantic Saturn V launch vehicle may well be the first and last of its kind. Subsequent space ventures will be based on new vehicles, such as the smaller, reusable Space Shuttle. Manned launches in the near future will be geared to orbital missions rather than planetary excursions, and unmanned deep-space missions will not demand the very high thrust boosters characteristic of the Apollo program. As the space program moves into the future, it also appears that the funding for elaborate "big booster" missions will not be forthcoming for NASA. The Saturn V class of launch vehicles are the end of the line of the Saturn generation. It is not likely that anything like them will ever be built again.

Because of the commanding drama of the awesome Saturn V, it is easy to forget the first Saturn-the Saturn I and Saturn IB. This history is an attempt to give due credit to these pioneering vehicles, to analyze the somewhat awkward origins of the Saturn I as a test bed for static testing only, not as an operational vehicle, and to discuss the uprated Saturn IB as an interim booster for the orbital testing of the first Apollo capsules. Evolution of the engines is also given considerable space early in the narrative. Because the Apollo-Saturn program was expected to put a man on the moon within a fixed time span, the use of available hardware was particularly attractive-an aspect of the program that is not generally appreciated by the public. The development of the early Saturn I and IB vehicles, as well as the engines, illustrates this approach. Inevitably, the unique nature of the mission called for advances in the state of the art, and the Saturn history includes some examples. One outstanding example is the development of high-energy liquid hydrogen engines. Other examples include the development of insulation for extended storage of large quantities of hydrogen in vehicle tanks and the advances in the computer technology of the guidance and control systems.

The development of Saturn was enormously expensive and time- consuming. Even given the expected costs of developments to advance the state of the art, why were the costs of the development time so great if [xvi] the program still relied so much on existing hardware? Part of the answer involves the uniqueness of dimensions. Even a proven component, to be used in the huge Saturn, had to be scaled up in size. The larger component had to withstand a similar increase in the amount of punishment inflicted on it, and this fact opened up a whole new regime of operational headaches. The scaling up of components and systems for lunar missions seemed to involve geometrical progressions rather than simple arithmetic progressions. The F-1 engines for the S-IC first stage graphically illustrate this difficulty. The size of the Saturn stages and engines also called for enlargement of test stands and other facilities, with attendant increases in time and costs. The logistical challenge assumed gargantuan proportions. The managers of the Apollo-Saturn programs also discovered unanticipated expenses in storing and maintaining exotic hardware that was subject to degradation unless constantly monitored, refurbished, and attended by additional cadres of technicians.

This book is a technological history. To many contemporaries the narrative may read too much like a technical manual, but the author's concern is for posterity, when the technical manuals may be lost or dispersed (as many are already) and knowledgeable participants have long since died. The narrative approach was largely predicated on questions that might well be asked by future generations: How were the Saturns made? How did they work? Two other histories, already published, deal with subjects keyed to the Apollo-Saturn program: (1) the development of the Apollo command and service modules along with the lunar module, and (2) the construction and operation of launch facilities at Cape Kennedy. These books contain much of the political and administrative struggles surrounding the origins and development of the Apollo program, and it would be redundant to retell the whole story for the Saturn history. I have therefore included only the background that seemed necessary to put the Saturn in proper perspective, and Part Two recapitulates the programmatic and administrative origins of Saturn. The bulk of the text is devoted to the theme of technological development. Even chapter 9, on management, is geared to the specifics of the technological management of Saturn vehicles.

The decision to treat the history of the Saturn program as a technological narrative shaped the nature of all sections of the book. So that some of the innovations and advances might be appreciated, it seemed advisable to include a brief historical overview of rocket technology. Against this background, I hope the Saturn story will stand out with greater clarity.

The narrative itself is organized into seven parts. The question was how to deal with the complexity of many simultaneous programs during the Saturn development that involved the various engines, stages, and associated equipment for three separate launch vehicles. A strict chronological organization seemed unnecessarily confusing. The topical approach, [xvii] although constructed in a loose chronological sequence, provided the opportunity to deal with the early technology involved in Saturn I and Saturn IB launch vehicles primarily in terms of the concept of clustering tanks and engines. The engines themselves, although they possessed inherent differences, evolved out of common principles of engine design and cryogenic technology. Dealing with these propulsion systems as a separate unit made the significance of their development stand out more clearly. Similarly, I analyzed the evolution of rocket stages as a unit and emphasized propellant tankage for the Saturn V vehicle. Although many early Saturn flights were concurrent with the research and development phases, all the launches are summarized in two chapters toward the end of the book. Just as the flights were the culmination of Apollo-Saturn, discussion of them all at the end of the narrative seemed logical.

The manned operations involving the spacecraft-the activities of the launch crews at liftoff-the role of the astronauts-these events involved discrete numbers of human actors. The inherent drama in launches and missions tended to spotlight the people involved. On the other hand, development of the Saturn launch vehicle rested on millions of hours of prior research and development and on thousands of designers, engineers, technicians, and specialists who worked behind the scenes. It was often impossible to single out a specific individual responsible for a specific achievement because most of the major decisions and breakthroughs resulted from elaborate team efforts. In fact, one veteran of the Marshall Space Flight Center told me that he preferred that the Saturn history not mention people at all. It was too hard, he explained, to isolate significant achievements without mentioning dozens of people who made successful contributions,

The launch vehicle, as dramatic as it was during liftoff, played a minor role in the total duration of a mission. It was visible to observers for only eight minutes or so as it blazed into orbit. The personnel of Houston's Mission Control and the astronaut crew occupied center stage for the lion's share of the lunar mission. For all the spectacular effects of the Saturn vehicle's awesome launch, most of the Saturn story deals with many years of unglamorous research, development, and test. It is a story of prior work: of nuts, bolts, and pyrotechnics-and that is the story I have tried to tell in these pages.



June 1979
R.E.B.
Houston
引用
评论
加载评论中,请稍候...
200字以内,仅用于支线交流,主线讨论请采用回复功能。
折叠评论

想参与大家的讨论?现在就 登录 或者 注册

所属专业
所属分类
上级专业
拔刀斋
学者 机友 笔友
文章
212
回复
6920
学术分
15
2006/08/19注册,2年1个月前活动
暂无简介
主体类型:个人
所属领域:无
认证方式:手机号
IP归属地:未同步
文件下载
加载中...
{{errorInfo}}
{{downloadWarning}}
你在 {{downloadTime}} 下载过当前文件。
文件名称:{{resource.defaultFile.name}}
下载次数:{{resource.hits}}
上传用户:{{uploader.username}}
所需积分:{{costScores}},{{holdScores}}下载当前附件免费{{description}}
积分不足,去充值
文件已丢失

当前账号的附件下载数量限制如下:
时段 个数
{{f.startingTime}}点 - {{f.endTime}}点 {{f.fileCount}}
视频暂不能访问,请登录试试
仅供内部学术交流或培训使用,请先保存到本地。本内容不代表科创观点,未经原作者同意,请勿转载。
音频暂不能访问,请登录试试
支持的图片格式:jpg, jpeg, png
插入公式
评论控制
加载中...
文号:{{pid}}
投诉或举报
加载中...
{{tip}}
请选择违规类型:
{{reason.type}}

空空如也

加载中...
详情
详情
推送到专栏从专栏移除
设为匿名取消匿名
查看作者
回复
只看作者
加入收藏取消收藏
收藏
取消收藏
折叠回复
置顶取消置顶
评学术分
鼓励
设为精选取消精选
管理提醒
编辑
通过审核
评论控制
退修或删除
历史版本
违规记录
投诉或举报
加入黑名单移除黑名单
查看IP
{{format('YYYY/MM/DD HH:mm:ss', toc)}}